Finalizing the Retrofit Blueprint: Detailed Production Design for the Demonstrator Vessel

Task 4.2, led by HYDRUS, is the continuation of the engineering developments of the demonstrator vessel’s basic design. During this task the full details regarding the installation of the PTI/PTO machine inside the Engine Room machinery space, as well as the placement of the CGH2 tanks and the H2 Genset, providing the necessary electricity for the power take in, will be finalized and the detailed technical specification will be generated to facilitate the retrofit works. Currently the design partners together with the Owner’s are listing in detail the provisional shipyard works in order to prepare well in advance the Drydock schedule and the technical implementation.